Our Projects

Socar Methanol Plant EPC project

In 2010 Module Caspi started the design and execution of a full EPC contract for Socar Methanol Plant. Our company has successfully fulfilled all the requirements and techical tasks of the customer.
As part of this project, Modul Caspi performed the following works:

  • Flame Arresters
  • Flame Detectors
  • Control Panel

Air Drying Unit to the South Caucasian Pipeline corridor.

In the 2017 year “Module Caspi has successfully deployed Air Drying Unit (15.000 m³/h (9.000 cfm), At sea level.) to the South Caucasian Pipeline corridor. Module Caspi Portable Air compressor will deliver highest productivity under all circumstances. Module Caspi will use soft pigs (Module Caspi Foam Pigs) to clean the pipelines inside. We have started already dewatering, and preparation for Pipeline Drying Project.  Then we will analyze and provide Dew